HOVER – Floating Toy Museum

ADS 8- Construction + Documentation
STUDIO 8 is a group construction/documentation studio. In groups of 4 we formed a small company and developed a Floating Toy Museum project from initial research to schematic design, onto final documentation. Consulting with industry professionals allowed us to problem solve and refine our schemes.
My main contribution to the project was to develop conceptual massing of the model in Autodesk Revit. This included the buildings main outer shell,  moulded ceilings, foyer shaping and built-in furniture. Other tasks were  developing exhibition and foyer layouts. As part of the group’s documentation I worked on reflected ceiling plans, finished furniture layouts, ceiling details, internal elevations and joinery (see above).

This slideshow requires JavaScript.

Slideshow of Final Documentation –
Group contributors – Bryce Bessel, Matt Stevenson, Edward Connelly + Codey Cartwright.
Collection of conceptual renders produced during the project.
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s